Fault Tree Analysis (FTA): Symbols, Steps & Practical Example
Introduction
A system failure can have several possible causes, but which ones can actually trigger the failure, and which require other conditions to occur?
That's where fault tree analysis becomes useful. Starting with a specific system failure, it works backward through contributing events using AND and OR gates to show which failures must occur together and which can cause the outcome independently.
This helps teams identify critical failure paths and assess their likelihood before deciding where preventive measures are needed.
In this guide, we'll cover FTA symbols, the analysis process, and a practical example using MockFlow to build and review fault tree diagrams.
What is fault tree analysis (FTA)?
Fault tree analysis (FTA) is a top-down, deductive method used to identify the possible causes of a specific system failure. It uses a fault tree diagram to show how individual failures or combinations of events can lead to an undesirable outcome. This helps teams assess system reliability, estimate failure probabilities, and identify preventive measures.
The analysis starts with a specific system failure, called the top event, and works backward to identify its contributing causes. A fault tree diagram maps these cause-and-effect relationships, placing the top event at the top and connecting underlying failures through logical gates.
The diagram includes:
- Intermediate events: Failures that result from other contributing events.
- Basic events: Individual failures that are not broken down further in the analysis.
- AND/OR gates: Connections showing whether multiple events must occur together or whether a single event can trigger a failure.
Following the principles outlined in IEC 61025, teams can use FTA for both qualitative analysis to identify possible failure paths and quantitative analysis to estimate their probabilities. This provides a structured basis for evaluating system risks and deciding where preventive measures are needed.
When and where is fault tree analysis used?
Fault tree analysis is used to assess potential failures before they occur or investigate the causes of existing failures. In Uptime Institute's 2025 Global Data Center Survey, 87% of respondents who experienced a major outage believed it could have been prevented through better management or processes. Systematic failure analysis helps teams examine the contributing conditions before deciding which safeguards need attention.
Common applications include:
- Manufacturing and industrial operations: Analyzes equipment breakdowns and production stoppages to identify whether individual component faults or combined failures cause downtime. Helps teams improve maintenance and prevent recurring disruptions.
- Aerospace and automotive engineering: Examines failures in safety-critical systems, such as aircraft flight controls and vehicle braking systems, to evaluate component reliability and the effectiveness of backup systems.
- Energy and power systems: Investigates power outages, transformer faults, and protection system failures to identify vulnerabilities and determine where additional safeguards or redundancy may be needed.
- Safety and risk assessment: Traces possible causes of hazardous events, such as chemical leaks or industrial fires, to understand how equipment failures and operational conditions could lead to accidents.
- Equipment maintenance and reliability: Identifies underlying causes of recurring equipment failures, helping teams prioritize preventive maintenance and address vulnerabilities that routine repairs may overlook.
- System design and development: Evaluates potential failure combinations before implementation or modification, allowing engineers to identify design weaknesses and assess the need for additional protective measures.
Reliability engineers, safety engineers, systems engineers, and risk analysts use FTA to understand critical failure pathways and make informed risk-reduction decisions.
Fault tree analysis symbols and their meanings
Fault tree analysis uses standardized symbols to show what can go wrong in a system and how different failures connect. These symbols fall into two categories:
- Event symbols represent individual failures, system conditions, or undesirable outcomes.
- Logic gates show whether one failure is enough to cause an outcome or whether multiple conditions must occur together.
Using the right symbols makes a fault tree diagram easier to interpret and review. With MockFlow's diagramming tools, teams can arrange editable shapes, add event labels, and connect failure paths on a shared canvas. This helps engineers build and revise complex fault trees without being restricted by a fixed page size.
Event symbols in fault tree analysis
Event symbols identify the failure conditions being investigated and show how far each cause has been analyzed.

They help engineers distinguish between the main system failure, contributing events, and failures that require no further breakdown within the chosen scope.
Event symbol | Shape | What it represents | Application example |
Top event | Rectangle | The primary system failure being investigated | Industrial cooling system fails to maintain the required temperature |
Intermediate event | Rectangle | A contributing failure caused by other events | Cooling water circulation is lost due to pump or valve failures |
Basic event | Circle | An individual failure not broken down further | Pump motor fails |
Undeveloped event | Diamond | An event left unexplored due to limited information or scope | An external power supply failure excluded from the current analysis |
Conditioning event | Oval | A condition required for a particular failure relationship | High ambient temperature must be present for a thermal failure scenario |
House event | House-shaped symbol | A condition assigned a fixed logical state in the model | Maintenance bypass assumed active during a specific operating scenario |
Transfer-in | Triangle, typically pointing toward the connected branch | Indicates that a failure branch continues from another part of the fault tree | A power supply failure analyzed elsewhere is referenced as a cause of pump unavailability |
Transfer-out | Triangle, typically pointing away from the connected branch | Indicates that a failure branch continues at another location in the fault tree | An electrical system failure is expanded in a separate diagram to show its underlying component faults |
Logic gate symbols in fault tree analysis
Logic gates connect failure events and determine which combinations can produce the event above them.

Choosing the correct gate is important because it changes how the system failure is interpreted and how its probability is calculated.
Logic gate | Meaning | When it's used | Application example |
AND gate | All input events must occur | A failure requires multiple conditions | Both primary and backup pumps must be unavailable to interrupt water supply |
OR gate | At least one input event must occur | Any one of several failures can cause an outcome | Cooling fails if either the circulation pump fails or a critical valve becomes blocked |
Exclusive OR gate | Exactly one input event occurs | The outcome depends on exactly one condition being present | A control fault occurs when exactly one of two mutually exclusive operating signals is active |
Priority AND gate | Input events must occur in a specified order | The sequence of failures affects the outcome | A protection system becomes unavailable before a hazardous equipment fault occurs |
Voting gate | A specified number of inputs must occur | Systems use multiple components with voting logic | A two-out-of-three sensor system triggers a shutdown when at least two sensors report a fault |
Inhibit gate | An input causes the output only when a specified condition is satisfied | A failure depends on a particular operating condition | Equipment overheating leads to shutdown only when cooling is unavailable |
How AND and OR gates differ
Consider an industrial water pumping system with two pumps: Pump A (primary) and Pump B (standby). The standby pump is designed to take over when the primary pump becomes unavailable.

The team wants to analyze the top event: "Pumping system fails to deliver water on demand."
- AND gate: If Pump A fails, Pump B can continue supplying water. The system loses pumping capability only when both pumps are unavailable at the same time. This relationship is represented using an AND gate.
- Tip: When evaluating redundant systems, check for remaining single points of failure in shared sensors, power supplies, and control connections. Test the standby system's automatic switchover and confirm that a failure in one shared component cannot disable both operating paths.
- OR gate: Now consider two other potential causes of water delivery failure: a blocked critical outlet valve and the loss of all pumping capability. Either condition can independently stop water delivery, so these events are connected through an OR gate.
Together, these relationships show how a fault tree can represent different failure scenarios within the same system. An AND gate identifies failures requiring multiple conditions, while an OR gate identifies alternative pathways to an undesirable outcome.
Related Read: 30 Flowchart Symbol Meanings: Shapes & Uses Explained
How to perform fault tree analysis with MockFlow: Step by step
Fault tree analysis follows a structured process that begins with defining the system failure and works backward to identify the events that could cause it. Once these relationships are mapped, teams can evaluate failure probabilities and determine where preventive measures are needed.

Let's walk through the process using a simplified, hypothetical industrial water pumping system. The example focuses on selected failure pathways and does not represent an exhaustive analysis of a real system.
Step 1: Define the undesired event
Start by identifying the specific system failure you want to investigate. In FTA, this is called the top event, and it determines the scope of the entire analysis.
Define the system's operating boundaries and the conditions under which the failure occurs. A vague statement like "Pump malfunction" leaves too much room for interpretation, making it difficult to identify relevant causes.
For our example, the top event is:
"Industrial water pumping system fails to deliver water on demand."
This establishes the outcome being investigated, regardless of which component causes the failure. The analysis can now focus on conditions that prevent water delivery when the system is required to operate.
To get started, you can use MockFlow's free, customizable Fault Tree Analysis template. It provides a prestructured layout with a top event, logical gates, and lower-level events.
Click on the image to customize this Fault Tree Analysis template
Open the template in MockFlow, replace the sample top event with your failure statement, and adapt the structure to your system's operating conditions. This gives your team a consistent starting point for investigating contributing failures.
Alternatively, you can create a diagram canvas and place the failure statement in a rectangle at the top. Leave space below for contributing events.
Step 2: Identify contributing events and causes
Identify the events that could directly or indirectly cause the top event. Review system architecture, equipment specifications, maintenance records, and incident reports. Consult engineering and operations teams to uncover overlooked failures.
For equipment controlled by programmable logic controllers, check mechanical and electrical inputs alongside control logic. Review sensor signals, wiring, and fault logs for intermittent issues.
For our pumping system, two immediate contributing conditions are:
- Critical outlet valve blockage: Water cannot reach its destination even when the pumps are operational.
- Both pumps unavailable: Neither the primary nor standby pump can deliver water.
Before adding these events to the fault tree, group related causes using a brainstorming board like MockFlow or a fishbone diagram. MockFlow's Fishbone Diagram template can help organize potential causes and distinguish direct failures from underlying issues.
Click on the image to customize this Fishbone diagram template
For our pumping system, two immediate contributing conditions are:
- Critical outlet valve blockage: Water cannot reach the required destination even when the pumps are operational.
- Both pumps unavailable: Neither the primary nor the standby pump can deliver water.
Each condition may have underlying causes that need further investigation.
MockFlow's sticky notes and mind maps help teams capture these possibilities and visualize connections between them. Upvotes, polls, and timers can keep discussions focused and help teams agree on which causes to investigate further.
For a deeper investigation, the 5 Whys Analysis template helps teams repeatedly question why a failure occurs, tracing issues such as recurring valve blockages back to their underlying causes before adding them to the fault tree.
Click on the image to customize this 5 Whys Analysis template
Step 3: Construct the fault tree
Now, arrange the identified events into a fault tree diagram, starting with the top event and branching downward through contributing failures.
For our pumping system:
- Place "Industrial water pumping system fails to deliver water on demand" at the top.
- Add an OR gate connecting the two immediate causes: outlet valve blockage and both pumps being unavailable. Either condition can stop water delivery.
- Add an AND gate beneath "Both pumps unavailable," connecting primary pump unavailability and standby pump unavailability. Both conditions must occur for this branch to cause failure.
- Expand intermediate events into lower-level causes until you reach the chosen basic-event level.
The resulting structure is:

Fault Tree Diagram created with MockFlow
To save time building the fault tree manually, you can use MockFlow's AI assistant, Mida, to generate an initial diagram from a text prompt. For example:
“Create a fault tree for a water pumping system that fails to deliver water on demand. Use an OR gate for outlet-valve blockage and both pumps being unavailable. Connect primary and standby pump failures using an AND gate.”
You can refine the output using MockFlow AI or integrate diagram creation into supported workflows through MCP and Agent Skills. Always verify the generated failure relationships and gate logic against actual system behavior.
Step 4: Gather failure data
Once the failure paths are mapped, collect data to estimate how likely each event is to occur. Qualitative FTA relies on logical relationships, while quantitative FTA requires reliable failure data.
Key sources include:
- Failure records: Maintenance logs and incident reports showing recurring faults.
- Reliability data: Component failure probabilities, failure rates, and manufacturer specifications.
- Operating conditions: Equipment usage and exposure periods that affect failure likelihood.
- System dependencies: Shared components or conditions that could cause multiple failures.
When similar components fail repeatedly, investigate shared operating conditions and power quality before treating each failure as an isolated event. Compare maintenance histories, measure voltage fluctuations and harmonics, and check environmental conditions to identify possible common causes.
Remember, failure rates and failure probabilities are different. A failure rate measures failure frequency over time, while probability measures the likelihood of failure within a defined period or demand. Use probabilities based on comparable conditions and timeframes.
For our pumping system, assume these hypothetical probabilities:
Basic event | Assumed failure probability |
Critical outlet valve blockage | 0.02 (2%) |
Primary pump unavailable | 0.10 (10%) |
Standby pump unavailable | 0.05 (5%) |
Recurring equipment failures can point to overlooked causes or gaps in maintenance procedures. MockFlow's Incident Postmortem Facilitator helps trace contributing factors across incidents, while the Process SOP Architect helps examine procedural gaps. Use these findings to refine failure paths, then validate the supporting data before assigning probabilities.
Step 5: Analyze failure paths and probabilities
Analyze the completed fault tree to determine which failures can trigger the top event and how likely they are to occur.
- Qualitative analysis: Identifies critical failure paths and minimal cut sets, the smallest combinations of basic events sufficient to cause the top event.
- Quantitative analysis: Uses failure probabilities and gate logic to estimate the likelihood of intermediate events and the top event.
For our pumping system:
- A: Outlet valve blockage (0.02)
- B: Primary pump unavailable (0.10)
- C: Standby pump unavailable (0.05)
The top event occurs when A happens OR both B and C occur:
T=A(BC)
The minimal cut sets are {A} and {B, C}.
1. Calculate the AND gate probability
Both pumps must be unavailable:
P(BC)=0.100.05=0.005
The probability is 0.5%.
2. Calculate the top event probability
Either a blocked outlet valve or simultaneous unavailability of both pumps can stop water delivery. Since these events are connected through an OR gate, calculate the top event probability as follows:
- Step 1: Apply the OR gate formula
P(T) = 1 − (1 − 0.02)(1 − 0.005)
- Step 2: Substitute and simplify
P(T) = 1 − (0.98 × 0.995)
P(T) = 1 − 0.9751
- Step 3: Calculate the final probability
P(T) = 0.0249 = 2.49%
The estimated probability of water delivery failure is 2.49%, assuming the events are independent and their probabilities are measured over the same operating period or demand. Shared failure causes could change this estimate.
Tip: You can use MockFlow's Prediction Market to compare expert forecasts when failure data is limited, and Planning Poker to estimate corrective-action effort without bias. Both help teams align on priorities, but engineering decisions still require validated reliability data.
Step 6: Interpret results and prioritize risks
Use the analysis to identify which failure paths need attention and where preventive measures could have the greatest impact.
For our pumping system, the two minimal cut sets reveal different vulnerabilities:
- Valve blockage: A single event can stop water delivery, making outlet-valve protection worth investigating.
- Both pumps unavailable: Failure requires both pumps to be unavailable. The team should assess pump reliability and shared causes that could affect both units.
Compare failure paths based on likelihood, severity, and operating conditions. Even a less likely failure may need immediate attention if its consequences are severe or existing safeguards are inadequate.
The financial consequences can also influence prioritization. Uptime Institute's 2026 Annual Outage Analysis found that 57% of surveyed operators who experienced a major outage estimated costs exceeding $100,000.
To make prioritization easier, consider using MockFlow's Dot Voting to gather team input on which failure paths deserve immediate attention. If engineers disagree on risk levels, Opinion Axis Plot can help visualize their assessments, identify differences, and guide discussions before deciding on corrective actions.
Step 7: Implement corrective actions and monitor results
Once the priority risks are clear, select corrective measures and assign responsibility for implementing them.
For our pumping system, possible actions include:
- Reduce valve blockage: Introduce suitable filtration, inspection, or maintenance measures.
- Improve pump availability: Strengthen preventive maintenance and test standby pump readiness.
- Address shared vulnerabilities: Investigate common power supplies or control systems that could disable both pumps.
Assign owners, document corrective actions, and update the fault tree to reassess remaining risks.
MockFlow's shared boards and text, audio, and video comments help teams track feedback and revise failure paths. Integrations with Google Meet, Microsoft Teams, Slack, Jira, and VS Code keep discussions connected to existing workflows.
Review the fault tree after major system changes or new incidents to keep the analysis accurate.
How to analyze a fault tree diagram
Reading a fault tree diagram involves tracing the relationships between the top event, intermediate failures, and basic events to understand which conditions can cause a system failure.
Here's how to interpret a completed fault tree:
- Start with the top event: Identify the failure being analyzed and check the system boundaries to understand what the diagram covers.
- Follow the branches downward: Trace contributing events to see how individual failures connect to the overall outcome.
- Interpret the logic gates: An AND gate requires all connected events to occur, while an OR gate indicates that any one of them can cause the higher-level failure.
- Identify critical failure paths: Look for single points of failure and combinations of events that could trigger the top event.
- Review minimal cut sets: Identify the smallest combinations of basic events sufficient to cause the failure.
- Interpret probability results: Compare failure likelihoods while considering data quality, shared dependencies, and operating assumptions.
When reviewing complex fault trees, teams can use MockFlow's AI-assisted workflows and MCP integration to add overlooked failure paths, reorganize crowded branches, and clarify event connections without manually redrawing the diagram.
Benefits and limitations of fault tree analysis
Fault tree analysis provides a structured way to investigate system failures and assess risks. However, its effectiveness depends on the complexity of the system, the accuracy of failure relationships, and the quality of available data.
Aspect | Benefits | Limitations |
Failure analysis | Traces possible causes of a specific system failure, helping teams identify contributing events. | Focuses on a defined top event, so other potential system failures may remain unexplored. |
Visualization | Makes complex failure relationships easier to understand through event symbols and logic gates. | Large systems can produce extensive fault trees that are difficult to interpret and maintain. |
Critical failure identification | Reveals single points of failure and critical event combinations through minimal cut sets. | Missing causes or incorrect gate relationships can lead to incomplete findings. |
Reliability assessment | Estimates failure probabilities when suitable component reliability data is available. | Incomplete failure data or unsupported assumptions can reduce the accuracy of probability estimates. |
Risk prioritization | Helps teams identify failure pathways that need further investigation or preventive measures. | Common-cause failures and time-dependent interactions may require advanced modeling techniques. |
Team collaboration | Gives engineering, maintenance, and safety teams a shared view of system vulnerabilities. | Requires sufficient technical knowledge and cross-functional input to build an accurate fault tree. |
For a broader risk assessment, teams can combine FTA with Failure Mode and Effects Analysis (FMEA). While FTA traces the causes of a specific system failure, MockFlow's FMEA Analysis template helps examine individual failure modes and their potential effects, giving teams a more complete view of system vulnerabilities.
Click on this image to customize this FMEA analysis template
Conclusion
Before starting fault tree analysis, make sure your team has a clearly defined system failure, relevant technical documentation, and input from the people who understand the system's operations. With these in place, the next step is to build a fault tree that everyone can review and refine.
MockFlow helps simplify that process with customizable diagrams, an infinite canvas, and AI-assisted visual creation. Your team can map failure relationships, expand complex branches, and update the diagram as new causes emerge. Real-time collaboration and contextual comments also make it easier to review assumptions and resolve technical questions without scattered discussions.
Want to see how MockFlow fits your team's analysis workflow? Sign up tp MockFlow to explore its diagramming and collaboration capabilities.
FAQs
1. What is the difference between FTA and FMEA?
FTA uses a top-down approach, starting with a system-level failure and tracing its possible causes. FMEA takes a bottom-up approach, examining individual component failure modes and their effects. Both methods complement each other by supporting different aspects of reliability and safety assessment.
2. What are the main components of a fault tree diagram?
A fault tree diagram consists of a top event representing the system failure, intermediate events showing contributing failures, and basic events representing underlying causes. AND and OR gates connect these events to show which individual failures or combinations can produce the top event.
3. How do AND and OR gates work in fault tree analysis?
An AND gate requires all connected events to occur, while an OR gate requires at least one. For example, a redundant pumping system may fail only when both pumps are unavailable (AND), whereas either a blocked outlet valve or complete pump unavailability can stop water delivery (OR).
4. How do you calculate failure probability in fault tree analysis?
Quantitative FTA combines basic-event probabilities according to the fault tree's logic gates. For independent events, AND gate probabilities are multiplied, while OR gate probabilities use the complement method. Shared dependencies or common-cause failures require adjusted calculations or more advanced reliability models.
5. What is a minimal cut set in fault tree analysis?
A minimal cut set is the smallest combination of basic events sufficient to cause the top event. Removing any event from that combination makes it insufficient to produce the failure. Identifying these sets helps engineers recognize critical failure paths and potential system vulnerabilities.
6. Which software can you use to create a fault tree analysis diagram?
Visual diagramming tools like MockFlow help teams create and review fault trees using customizable templates, AI-assisted diagram generation, and collaborative editing. You can start with MockFlow's Fault Tree Analysis template. Advanced probability calculations and formal quantitative FTA may require specialized reliability analysis software.